Overview
Quick Details
Type:
Other Flooring

Specifications

When it comes to flooring, there are several options open to the purchaser.
However

Flooring

When it comes to flooring, there are several options open to the purchaser.
However, please note that Tilley Sheds do not supply flooring.


Existing Concrete / Paved Base

Tile adhesive or strong mortar mix is applied to the base.
Alternatively pavers can be used to raise the floor level internally to provide a water free surface.

 

Bare Area

The area should be cleared and levelled before the installation team arrives on-site. The unit is erected on 4 bricks (supplied by purchaser).

 

The inside must be levelled to the bottom of the angle iron and compacted.

 

 

 

 

Formwork must be approximately 200mm around the unit.

 

 

 

 

 

Corner tool optional

Allow to dry for approximately 4 days